PT Noblewealth Resources

Visit Website: http://www.noblewealthresources.com

Integrated Katingan Project consist of several independent and profitable projects, ranging from upline to downline process which its integration make all the project get its ultimate strength of being most efficient and most profitable.

The Coal Mining Project is among the lowest production cost mine site as its Stripping Ratio base on the valid JORC drilling Report is only 1:1.36. Its Huge reserve assure the sufficient fuel supply for the Power Plant Projects which will guarantee the power need of the industries demand. Its Reserve base on mapping in 3,000 Hectares (about 33% of concession wide) is above 300 million Metric tonnes. The valid scout drilling in 1,710 hectares (about only 19 % of concession wide) assure the resources 151 millions tonnes. And the JORC drilling report in only 550 Hectares (6% of the concession wide) assure the mineable reserve 46,9 millions tonnes.

The Power Plant Projects, not only a very interesting project with the secured income from the State Owned Electric company (PLN), its most profitable as well benefiting from the lower production cost for its lower coal price, while in other side benefiting higher Power Purchase Price from Government as its located in less electric supply area. The mine mouth Power plant are giving the mining project a very best profit as well, which enable the mining project to profit more than non mine mouth mining sites.

The Palm Oil Plantation Projects, a part of food estate projects to prepare future food security for the country, it will be an integrated project together with cassava and other food plantation. The wide area of 56,000 ha with integrated concept with cattle fattening will also produce sufficient and sustainable meat supply for the developed area.

The Industrial Forest Plantation and Industry Projects, is a kind of the replanting of the forest are with the industrial commodity like rubber tree, and other kind of trees which is able to be used for both industrial need and as well to provide long security supply of power from the Biomass Power Plants.

Contact Us

Address:

H Tower Lt 17G. Jl HR Rasuna Said Kav. 20 Jakarta Selatan 12940

Email:

info@theseamgroup.com

Phone:

+62 21 29533226

Fax:

+62 21 28543336