PT Sumber Energi Alam Lestari
THE COAL MINING PROJECT
Visit Website: http://www.sealenergi.com
SEAL AIMS TO PROVIDE ENERGY WITH OPTIMUM BURNING FOR A SHARP BUSINESS GROWTH AND SAFEST ENVIRONMENT.
The Coal Mining Projcet is amongst the mines with the lowest production cost as demonstrated by its 1: 1.36 stripping ratio (based on the valid JORC drilling report).
Its huge reserve assures sufficient fuel for the power plant project, guaranteeing the energy needs of the industry demands. Its reserve based on mapping in 3,000 hectares (about 33% of the concession wide) is above 300 millions metric tonnes.
The valid scout drilling in 1,710 hectares (approximately 19% of the concession wide) assures the resources 151 million tonnes. Furthermore, the first stage of JORC drilling report is only 550 hectares (6% of the concession wide) assures the minable reserve of 46.9 million tonnes.
Its huge reserve assures sufficient fuel for the power plant project, guaranteeing the energy needs of the industry demands. Its reserve based on mapping in 3,000 hectares (about 33% of the concession wide) is above 300 millions metric tonnes.
The valid scout drilling in 1,710 hectares (approximately 19% of the concession wide) assures the resources 151 million tonnes. Furthermore, the first stage of JORC drilling report is only 550 hectares (6% of the concession wide) assures the minable reserve of 46.9 million tonnes.
.
PROJECT SUMMARY


PROJECT LOCATION